SC 85 Bridge Replacement

SCDOT will be replacing the on SC 85 over Southern RR and S-42-995 at MM 3.73 and the bridge on SC 85 over S-2 (Howard St) at MM 3.81.

Schedule:

  • Preliminary Engineering began Summer 2014 and is scheduled to be complete Spring 2018
  • Right of Way is scheduled to begin Spring 2016 and be complete Spring 2018
  • Construction is scheduled to begin Summer 2018 and be complete Winter 2021-2022




Link to construction updates on the SCDOT website:SC 85 Bridge Replacement Project